Skip to content
Monday – Friday: 7 a.m. – 5 p.m. · Saturday: By appointment · Sunday: ClosedMonday – Friday: 7 a.m. – 5 p.m.(205) 555-0100

The outline

The proposal packet, page by page

This is the order of the packet we hand a board. Each page has one job, so a volunteer can read it in one sitting.

  • Page 1: The summary

    What is wrong, what we propose, the total and the dates, on one sheet for the vote.

  • Page 2: What we found

    The building, the system by room, its age and condition, and what is not working. Photographs of nameplates and units.

  • Page 3: The scope, line by line

    Each unit, duct, control and electrical item that the work touches, with the equipment model and the permit.

  • Page 4: Bids to compare

    Our bid, and the list of what a second contractor’s bid should state: equipment model, scope, permit, haul-away, warranty terms and how long the bid holds.

  • Page 5: Insurance certificate

    Our certificate with your church or school as holder, and a line where your insurer’s wording requests go.

  • Page 6: Work around services and classes

    A calendar of the days we are in the building, the days we are not, and what is loud.

  • Page 7: Warranty and payment

    Warranty terms in full, the payment schedule and what each payment is tied to.

  • Page 8: Signature and next step

    A signature line for whoever your bylaws let sign, and the next step if the board says yes.

Compare like with like

A bid a board can compare

Two quotes for "a new rooftop unit" can be two different jobs. This is what we put in ours and what we suggest you ask any contractor to put in theirs.

A bid a board can compare
A one-line quoteIn our packet
ScopeA one-line quote"Install new system"In our packetEach unit, duct and control, listed
EquipmentA one-line quoteA tonnage and a brandIn our packetMake and model of every unit
PermitA one-line quoteNot mentionedIn our packetPulled by us; the fee is shown
Old equipmentA one-line quoteNot mentionedIn our packetRemoval and haul-away listed
InsuranceA one-line quote"Fully insured"In our packetCertificate attached
ScheduleA one-line quote"Start next week"In our packetA calendar built around your services
WarrantyA one-line quoteA number of yearsIn our packetTerms in full

After the packet

From packet to finished work

  1. 01

    Step 1: The board reads it

    Take as long as the board needs. The bid holds for the period written on the page.

  2. 02

    Step 2: We answer questions

    Marla Sutherland takes questions by phone or email and sends a revised page if something changes.

  3. 03

    Step 3: The board signs

    Whoever your bylaws authorize signs. We set the dates on the calendar page.

  4. 04

    Step 4: We do the work

    A lead tells your office each morning what is happening. The calendar page stays on the wall.

  5. 05

    Step 5: We walk it with you

    At the end we show your contact each unit, the controls and where the filters go.

Ready for a packet the board can read?

Tell us the building and when the services or classes meet. We call back the next working morning.